The outgoing routes for the Case Setup step are marked as "all true conditions" to enforce the requirement that the engineering lead and research lead work in parallel.
Case Setup 步骤的传出路径(outgoing route)被标记为 “all true conditions”,以便满足以下要求:工程主管和研究主管必须同时工作。
For the rural biogas engineering research and building in Guizhou province, the time is urgent and the duties is layers and the special design & research setup is lack.
贵州的农村沼气工程研究及建设,时间紧任务重,专业设计研究机构缺乏。
The setup of theories and methods of soil micromechanics, first offered by the authors, will open up an fall new research domain and work condition for engineering geologists.
提出的“微结构力学”理论与方法体系的建立,将为土体工程地质研究开辟崭新的研究领域和工作空间。
应用推荐